We promised our supporters transparency, so this page exists from day
one — before there is much to report. We will post progress here as
it happens, including the parts that do not go to plan. Rebuilding
after a flood is slow, and we would rather show you that honestly
than only post good news.
September 2026 — This campaign opens
Fourteen months after the flood, we are opening the rebuilding
campaign to the public. The design work is done, the professional
team is assembled, and the floodplain requirements are understood.
Our family has committed $500,000 of our own funds. The community
and our extended family have contributed $343,000 in donations,
labor, and materials. What remains is $600,000.
Construction has started. The first of three foundations is
poured — the ground cleared, graded, and the slab down. Two more
follow.
We will post construction progress, restoration photographs, and
honest accounting as the work proceeds.
September 2026 — the first of three
foundations poured
August 2026 — A flood warning system on Sandy Creek
A River Sentry flood warning
device is now installed on the property, watching the creek that
took our homes.
These are new. Weeks before ours went in, River Sentry units
installed elsewhere in Texas gave warning during the 2026 floods
and people got out in time. That is the whole argument for them:
on July 5, 2025, the water went from nothing to chest height in
thirteen minutes, and thirteen minutes of warning is the difference
between losing a house and losing a family.
One device protects one stretch of creek. We are working to get
them installed the length of Sandy Creek, so that the next time the
water rises in the dark, every household here hears about it before
it arrives.
The device on the creek bankRiver Sentry completing the
installation
Watching the water from the rebuilt
bankInstalled among the trailers families