The rebuild

Building something better

The first of three foundations is poured. Two more follow.

Recovery gave us an unexpected choice. We could rebuild Asher Acres exactly as it had been, or we could apply everything the flood taught us and build something stronger for the people who come after us.

We chose the second. The next chapter is rooted in the same values as the first — hospitality, stewardship, resilience, community — but designed for the realities of tomorrow.

Why the cost changed

Updated floodplain regulations require our homes to sit two feet above the floodplain — which, on this ground, means building roughly ten feet in the air. That single requirement drives up the cost of foundations, structural systems, utilities, accessibility, and supporting infrastructure before construction of the homes themselves can even begin.

It also creates an opportunity. A ten-foot lower level cannot be used as living space — so it becomes shared space instead.

Upper floor — the homes

Bedrooms, bathrooms, kitchen, dining, and living areas, elevated above the floodplain while staying connected to the property through barrier-free access.

Lower level — common ground

The Asher Acres spice business, a community meeting space, a workshop, and a garage. The part of the building the flood rules forced on us is the part the community gets to use.

Five phases

  1. Construction of homes and infrastructure — elevated foundations, structure, and utilities meeting floodplain requirements.
  2. Accessibility improvements — lift access and barrier-free pathways throughout the site, so the homes and shared spaces work for visitors of every age and ability.
  3. Sustainable resource systems — solar generation, battery storage, and rainwater harvesting to cut long-term resource demand and keep power and water available during outages.
  4. Riparian and habitat restoration — native vegetation, improved drainage and erosion control, and reestablished creek and floodplain habitat.
  5. Community spaces and amenities — landscaping and gathering areas that make the restored property a place for connection, education, and community life.

Walk around the homes

This model of both homes is built from the architect’s permit drawings. Drag to turn it, scroll or pinch to move closer, or jump to either house.

Architectural rendering of the rebuilt home: a long
                    metal-roofed house raised on columns, with a covered
                    porch on the upper floor.
The two homes and the deck that joins them, modeled from the architect’s drawings. Shape and proportions follow the plans; colors and the setting are illustrative.
A freshly poured concrete foundation, its surface still wet
                  and reflecting the evening sky. Timber forms run along the
                  near edge, water lines cross the ground in front of it, and
                  a skid-steer sits parked at the far side beneath the
                  trees.
Where the work stands today — the first of three foundations poured.
A green tractor fitted with a brush cutter working beneath
                    the trees, with cut limbs and brush piled in the
                    foreground.
Clearing flood debris and overgrowth.
A yellow backhoe standing on newly graded gravel under a
                    blue sky, with a trailer and outbuildings along the
                    treeline behind it.
Ground graded and the site staged for building.

The budget

Proposed budget for the Asher Acres rebuild, as submitted in the project proposal. Shares are rounded to whole percentages and do not sum to 100.
Project and initiative Amount Share
Construction of homes, community spaces, and supporting infrastructure$1,222,81083%
Renewable energy and water conservation$111,5008%
Landscaping, gathering spaces, and community amenities$48,5083%
Floodplain restoration and native habitat establishment$36,3203%
Accessibility improvements$23,8622%
Total project$1,443,000100%

Figures as submitted in the project proposal. Shares are rounded to whole percentages.

How it is being funded

Funding sources for the rebuild
SourceAmount
Family personal funds committed$500,000
Community donations and family contributions received to date$343,000
Still needed$600,000

Funds received to date reached us through several channels, including direct community support, volunteer labor, and donated materials. Gifts made through this campaign are received and administered by Gifted Dreamers, Inc.

The site

Master site plan of Asher Acres. The property boundary is
                  drawn around the creek, with hatched areas marking upland,
                  facultative and wetland planting zones. Numbered items
                  locate the spice business and community meeting space, the
                  existing greenhouse, the well and pump house, the surviving
                  goats and pigs, Aunt Donna's home, the rainwater catchment
                  tank, and a circled area reserved for future growth — an
                  education center, community gardens and a solar farm.
Master site plan, with upland, facultative, and wetland planting zones marked
Architectural floor plans for the rebuilt residence, first